PROPOSED CONSTRUCTION OF RESIDENTIAL HOUSE AT VISEZI, CHALINZE
Project Highlights
- CLIENT: AMANI HERMAN
- LOCATION: PWANI
- CONTRACT SUM: 26,000,000
- PROJECT ID: 2023/004

AGAPAI-ENTERPRISE successfully executed this project as part of our commitment to delivering high-quality building finishing and architectural enhancement works. The project focused on transforming the structure into a modern, durable, and visually appealing facility through carefully planned interior and exterior finishing solutions. Our team applied technical expertise, quality materials, and strict workmanship standards to ensure that every element of the building met both functional and aesthetic expectations. The scope included painting, Tanga stone installation, lighting works, tile and marble fitting, gypsum ceiling decoration, metal grills, and aluminum windows and doors.
1. Painting Works

Painting was carried out to protect surfaces and enhance the building’s appearance.
Steps involved:
-
Cleaning and preparation of wall surfaces
-
Filling cracks and leveling with putty
-
Application of primer
-
Application of first and second coats
-
Final inspection and touch-ups
This created a smooth, attractive, and weather-resistant finish.
2. Tanga Stone Works

Tanga stone was installed to give the building a natural and elegant exterior and interior finish.
Steps involved:
-
Surface leveling and marking
-
Cutting and shaping stones
-
Application of bonding mortar
-
Fixing stones in correct pattern
-
Grouting and cleaning
The result was a strong, durable, and stylish stone finish.
3. Lighting Works

Lighting works were completed to provide safety, comfort, and architectural beauty.
Steps involved:
-
Layout planning and wiring routes
-
Installation of conduits and cables
-
Fixing light fittings and switches
-
Connection to power supply
-
Testing and commissioning
This ensured efficient and well-distributed lighting throughout the building.
4. Tiles and Marble Works

Tiles and marble were installed to create elegant, durable, and easy-to-maintain floors and walls.
Steps involved:
-
Surface preparation and leveling
-
Layout planning
-
Application of adhesive
-
Tile and marble placement
-
Grouting and polishing
These finishes added both beauty and long-term durability.
5. Gypsum Ceiling Decoration

Gypsum ceilings were installed to enhance interior design and hide electrical and mechanical systems.
Steps involved:
-
Framework installation
-
Fixing gypsum boards
-
Joint filling and sanding
-
Decorative design installation
-
Painting and finishing
This created a modern and refined interior appearance.
6. Window and Door Grill Installation

Metal grills were installed to improve security and architectural appeal.
Steps involved:
-
Measuring window and door openings
-
Fabrication of grills
-
Surface treatment and painting
-
Installation and fixing
-
Final alignment and inspection
This provided safety without compromising design.
7. Aluminum Window and Door Installation

Aluminum frames were installed for strength, durability, and modern style.
Steps involved:
-
Accurate measurement and fabrication
-
Preparation of openings
-
Frame installation
-
Glass fitting and sealing
-
Final adjustment and testing
These systems offered smooth operation, weather resistance, and an elegant finish.
Conclusion

Through this project, AGAPAI-ENTERPRISE demonstrated its capability in delivering high-standard finishing and decoration works. Every stage was carried out with precision, from surface preparation to final detailing, resulting in a building that is attractive, functional, and built to last. This project stands as a strong example of our professionalism and commitment to excellence in construction finishing and architectural works.
Related Projects
SUPPLY OF ELECTRICAL EQUIPMENTS FOR TEACHING
CLIENT: MBEYA UNIVERSITY OF SCIENCE AND TECHNOLOGY
SUPPLY AD INSTALLATION OF WATER FILTERS AT NJOMBE REGIONAL HOSPITAL
CLIENT: NJOMBE REGIONAL REFFERAL HOSPITAL